RI ENG PTY LTD provides hydraulic engineering services in Parramatta, covering stormwater drainage design, OSD tank sizing and drainage reports for houses, duplexes and townhouses. We know City of Parramatta Council’s drainage standards and deliver compliant designs within 2–5 business days.

City of Parramatta has some of the more detailed stormwater rules in Sydney, especially around OSD. RI ENG PTY LTD works as your hydraulic engineer for Parramatta projects, preparing drainage designs and reports that match the council’s technical requirements from the start.

Need a Hydraulic Engineer for Your Parramatta Project?

📞 Call Us 💬 WhatsApp 📧 Email Us 📅 Book Appointment 📋 Contact Form

Drainage Engineering in the Parramatta LGA

Parramatta is one of the most active residential development areas in Western Sydney. New houses, duplexes and townhouses are going up across Wentworthville, Merrylands, Pendle Hill, North Parramatta and the surrounding suburbs.

Every new residential project in the City of Parramatta Council area needs a compliant stormwater drainage design before construction can start.

City of Parramatta Council has specific requirements for drainage grades, OSD, and connection to the street drainage network. These differ in some ways from neighbouring councils.

RI ENG PTY LTD designs stormwater drainage systems for Parramatta residential projects. We apply the correct council standards and deliver reports that your certifier can use directly.

We are not based in Parramatta, but we service the LGA remotely and efficiently.

Parramatta DA Waiting on Drainage? We Move Fast

Reach out through any channel — we respond fast.

📞 Call 💬 WhatsApp 📧 Email 📅 Book Appointment 📋 Contact Form

OSD Requirements in Parramatta

City of Parramatta Council requires OSD for most residential developments where impervious area exceeds 30% of the lot.

The permissible site discharge (PSD) rate in Parramatta is typically 10 litres per second per hectare for a 1-in-10-year storm event.

We calculate the correct OSD tank size for your lot, apply the current PSD rate and produce a specification that your builder can price and install.

If you are building a townhouse development in Parramatta, OSD is almost certainly required. We calculate this before quoting so there are no surprises.

We also check whether a rainwater tank can satisfy dual OSD requirements under the council’s policy.

Get Parramatta Council-Compliant Drainage Plans

📞 Call Now 💬 WhatsApp 📅 Book Appointment 📧 Email 📋 Contact Form

Documents We Deliver for Parramatta Projects

For a typical Parramatta residential project, we deliver a drainage plan, a hydraulic calculation report and an OSD specification.

The drainage plan shows pipe sizes, pit locations, grades and the street connection point.

The hydraulic report shows our calculations, the design storm intensity and the compliance with council requirements.

The OSD specification shows tank dimensions, inlet, outlet orifice, overflow and maintenance access.

Everything your certifier needs comes in one submission. Turnaround is 2–5 business days.

Not Sure What Parramatta’s OSD Rules Mean for You?

Talk to a Parramatta Hydraulic Engineer Today

📞 Call 💬 WhatsApp 📅 Book Appointment 📋 Contact Form 📧 Email

Common Questions About Hydraulic Engineering in Parramatta

Q: Does City of Parramatta Council require OSD for a house?

A: Yes, if impervious area exceeds the council threshold. RI ENG PTY LTD checks this before starting your design.

Q: Can you handle drainage design for Parramatta developments remotely?

A: Yes. We work entirely from your documents. No site visit is needed for standard residential projects.

Q: Do you know Parramatta Council’s drainage connection requirements?

A: Yes. We design to Parramatta’s specific standards, including their pipe sizing and OSD rules.

Q: How long does drainage design take for a Parramatta duplex?

A: Most duplex drainage designs in Parramatta are ready within 3–5 business days of receiving your plans.

Q: What if the council requests additional information after submission?

A: We respond to council queries at no additional charge when they relate to our design assumptions.

Ready to Start Your Parramatta Project?

RI ENG PTY LTD provides hydraulic and stormwater engineering for houses, duplexes, townhouses and granny flats across the City of Parramatta LGA.

Send us your site address, survey and architectural plans. We will confirm the OSD and drainage requirements and give you a fixed fee.

🌐  riengineering.com.au

📞  +61 0451 452 932

📧  riengineering2155@gmail.com

Start Your Parramatta Drainage Design with RI ENG PTY LTD

OSD, drainage plans and reports. Built to Parramatta standards.

📞 Call Now 💬 WhatsApp 📧 Email 📅 Book Appointment 📋 Contact Form